PSN 2024 - 004 Transition of NSW TrainLink Operations to Sydney Trains
1–20 of 29 search results
PSN 2024 - 004 Transition of NSW TrainLink Operations to Sydney Trains
Lookout Working Prohibited Locations Register
This document describes the requirements for access to Network information publications.
This document describe the rules for use of communications equipment in the Network.
This document describes the requirements for issuing a Network Incident Notice (NIN).
This document describes the requirements for using Train Operating Conditions (TOC) Waivers.
When planning or performing work on aerial line poles, transformers, switchgear, or other electrical network structures, it is critical to consider the risks associated with working at heights and implement appropriate controls.
This alert provides information on the processes for working with Asbestos Containing Material (ACM).
NTR 432 protecting activities associated with in-service rail traffic script.
Contractor working in the rail corridor or performing safety critical work must pass health assessment to confirm they are fit to do such work.
Requirements for communications in the Sydney Trains Network.
This standard applies to the temporary and permanent installation of ATWS, where all or some of the equipment may be installed or used within designated yard limits.
Requirements for evacuating people to the track in the Sydney Trains Network.
Requirements for determining the dispatch method to be used for passenger trains departing from platforms.
This document describes the requirements for spoken and written communication.