PSN 2024 - 004 Transition of NSW TrainLink Operations to Sydney Trains
1–14 of 14 search results
PSN 2024 - 004 Transition of NSW TrainLink Operations to Sydney Trains
This document describes the requirements for using Train Operating Conditions (TOC) Waivers.
When planning or performing work on aerial line poles, transformers, switchgear, or other electrical network structures, it is critical to consider the risks associated with working at heights and implement appropriate controls.
Drug and Alcohol Rehabilitation Providers.
Drug and Alcohol Rehabilitation Providers Questionnaire.
Contractor working in the rail corridor or performing safety critical work must pass health assessment to confirm they are fit to do such work.
Agreement to participate in drug and alcohol rehabilitation.
Requirements for evacuating people to the track in the Sydney Trains Network.
This standard applies to the temporary and permanent installation of ATWS, where all or some of the equipment may be installed or used within designated yard limits.
Drug and Alcohol Management Program outlines workplace substance risk control measures.
Rehabilitation following a positive drug or alcohol test.
Being free of drugs and alcohol while at work is our shared responsibility
This document describes the requirements for using Train Operating Conditions (TOC) Waivers.