PSN 2024 - 004 Transition of NSW TrainLink Operations to Sydney Trains PSN 2024 - 004 Transition of NSW TrainLink Operations to Sydney Trains View document Communication Compliance Operating Trains & Track Vehicles
SP D 79055 Electrical Competency Specific Certifications This document details the competency requirements for all accreditations, certifications and authorisations required to install, operate, maintain and decommission Electrical Distribution and Rail Traction Networks assets owned by Transport Asset View document Electrical Safety
NPR 700 Using a Local Possession Authority This document describes the procedure for planning, implementing and managing a Local Possession Authority (LPA). Visit page Authority Operating Trains & Track Vehicles Possessions Worksite Protection
NPR 736 Using bell signals This document describes the procedure for using bell signals. Visit page Operating Trains & Track Vehicles
NPR 740 Responding to faulty points This document describes the procedure for responding to faulty points. Visit page Operating Trains & Track Vehicles
NPR 748 Track vehicle travel This document describes the procedure for track vehicle travel. Visit page Operating Trains & Track Vehicles Signals and Signs
NPR 721 Spoken and written communication This document describes the procedure for spoken and written communication. Visit page Communication
NPR 710 Piloting rail traffic This document describes the procedure for piloting rail traffic. Visit page Operating Trains & Track Vehicles Possessions Worksite Protection
NPR 713 Placing temporary speed signs This document describes the procedure for placing temporary speed signs. Visit page Operating Trains & Track Vehicles Signals and Signs
NSG 600 Running signals This document describes the types of running signals. Visit page Authority Operating Trains & Track Vehicles Signals and Signs
NPR 706 Removing 1500V supply in Electric Vehicle Maintenance Centres This document describes the procedure for removing the 1500V supply in Electric Vehicle Maintenance Centres. Visit page Electrical Safety
NPR 750 Protecting activities associated with in service rail traffic This document describes the procedure for protecting in-service rail traffic inspections and repairs. Visit page Operating Trains & Track Vehicles
Contractor rehabilitation following a positive drug or alcohol test information sheet Rehabilitation following a positive drug or alcohol test. View document Drugs and Alcohol Health Assessment
NPR 709 Using railway track signals This document describes the procedure for using Railway Track Signals. Visit page Operating Trains & Track Vehicles Possessions Special Working Worksite Protection
PR D 78109 Pole Top Rescue This document describes the Pole Top Rescue procedure and the use, inspection and care of Pole Top Rescue Kits. View document Electrical Safety
NPR 737 Switching a signal box or local control panel in and out This document describes the procedure for switching a signal box or local control panel in and out. Visit page Operating Trains & Track Vehicles
NPR 747 Using Drivers time release buttons This document describes the procedure for using Drivers time-release buttons. Visit page Operating Trains & Track Vehicles
NSY 516 Pilot Staff Working This document describes the requirements for pilot staff working. Visit page Authority Operating Trains & Track Vehicles Special Working
NSY 514 Special Proceed Authority This document describes the requirements for using a Special Proceed Authority (SPA). Visit page Authority Operating Trains & Track Vehicles Special Working