1–20 of 58 search results
This document describes the requirements for pilot staff working.
This document describes the requirements for using a Special Proceed Authority (SPA).
This document describes the requirements for manually maintaining blocks between rail traffic movements.
This document describes the requirements for suspending a system of Safeworking.
This document describes the requirements for using the system of Safeworking used in axle counter territory and continuously track-circuited territory.
Railway LED Lantern Test Locations for colour vision.
Drug and Alcohol Rehabilitation Providers.
This document describes the procedure for planning, implementing and managing a Local Possession Authority (LPA).
Contractor working in the rail corridor or performing safety critical work must pass health assessment to confirm they are fit to do such work.
Agreement to participate in drug and alcohol rehabilitation.
Rehabilitation following a positive drug or alcohol test.
Guidance to Rail Infrastructure Managers (RIM) and Authorised Engineering Authorities (AEO) when considering proposals for changes to Yard Limits.
This document describes the procedure for planning, implementing and managing a Track Work Authority (TWA).
Health assessment examination record form is for use of only by authorised health professional