NTR 428 SAFE Notices This document describes the requirements for using SAFE Notices. Visit page Operating Trains & Track Vehicles Possessions Special Working Worksite Protection
NGE 222 Working around electrical infrastructure This document describes the requirements for non-infrastructure workers working around electrical infrastructure. Visit page Electrical Safety Worksite Protection
NPR 703 Using Absolute Signal Blocking This document describes the procedure for using Absolute Signal Blocking (ASB). Visit page Lookout Worksite Protection
NPR 702 Using a Track Work Authority This document describes the procedure for planning, implementing and managing a Track Work Authority (TWA). Visit page Authority Operating Trains & Track Vehicles Worksite Protection
NPR 701 Using a Track Occupancy Authority This document describes the procedure for planning, implementing and managing a Track Occupancy Authority (TOA). Visit page Authority Operating Trains & Track Vehicles Possessions Worksite Protection
NPR 700 Using a Local Possession Authority This document describes the procedure for planning, implementing and managing a Local Possession Authority (LPA). Visit page Authority Operating Trains & Track Vehicles Possessions Worksite Protection
NWT 314 Work trains This document describes the rules for operating work trains. Visit page Operating Trains & Track Vehicles Possessions Worksite Protection
NPR 711 Using Lookouts This document describes the procedure for using Lookouts Visit page Lookout Worksite Protection
NPR 714 Removing 1500V supply in unplanned situations This document describes the procedure for removing 1500V supply in unplanned situations. Visit page Electrical Safety Possessions
NWT 302 Local Possession Authority This document describes the requirements for authorising, issuing and using a Local Possession Authority (LPA). Visit page Possessions Worksite Protection
NPR 751 Calculating Minimum Warning Time This document describes the procedure for calculating Minimum Warning Time (MWT). Visit page Worksite Protection
NPR 708 Using X, Y and Z keys This document describes the procedure for using X, Y and Z keys. Visit page Worksite Protection
NPR 753 Using Signal Key Switch Blocking This document describes the procedure for using Signal Key Switch (SKS) Blocking. Visit page Worksite Protection
NPR 754 Using a signal key switch This document describes the procedure for using a signal key switch (SKS). Visit page Worksite Protection
NPR 710 Piloting rail traffic This document describes the procedure for piloting rail traffic. Visit page Operating Trains & Track Vehicles Possessions Worksite Protection
NPR 752 Using Automatic Track Warning Systems This document describes the procedure for using Wireless Automatic Track Warning Systems (ATWS). Visit page Lookout Worksite Protection
NPR 706 Removing 1500V supply in Electric Vehicle Maintenance Centres This document describes the procedure for removing the 1500V supply in Electric Vehicle Maintenance Centres. Visit page Electrical Safety
NPR 709 Using railway track signals This document describes the procedure for using Railway Track Signals. Visit page Operating Trains & Track Vehicles Possessions Special Working Worksite Protection
NSG 616 Precautions during signalling equipment testing This document describes the requirements for precautions during signal testing. Visit page Operating Trains & Track Vehicles Signals and Signs Worksite Protection