Description
This document describes the requirements for recording and notifying changes to the Network due to the installation or removal of infrastructure.
Not what you are looking for? See more NWT Rules
Purpose
To prescribe the rules for recording and advertising changes to the Network for:
- the temporary or permanent installation or removal of infrastructure
- booking infrastructure into or out of use.
Removal of 1500V overhead supply is prescribed in:
Advertising infrastructure work
Maintenance Representatives must make sure that work on infrastructure that affects the configuration of the Network is documented and advertised in a Weekly Notice.
Infrastructure must be advertised in a Weekly Notice before it is commissioned or decommissioned/permanently removed.
Securing infrastructure
Infrastructure that is not yet commissioned, or has been decommissioned but not yet removed, must be secured against unauthorised use.
Certifying infrastructure
Infrastructure that has been installed or removed must be certified in an IBA form:
- compiled by the relevant Maintenance Representatives
- acknowledged by the Signaller.
Booking infrastructure back into use
If infrastructure has been certified as working correctly, the relevant section of the IBA form must be signed.
The Maintenance Representative must give a copy of the IBA form to:
- the Possession Protection Officer for work associated with a Local Possession Authority (LPA), or
- the Protection Officer for work associated with a TOA or a TWA.
If parts of the infrastructure cannot be certified at the end of work, they must be booked out of use again in a new IBA form.
The new IBA form must:
- be compiled before the original IBA is signed
- include a reference to the original IBA.
The original IBA form must include a reference to the new IBA for those parts of the infrastructure that were not certified.
Using uncommissioned infrastructure
Infrastructure that is not yet commissioned (uncommissioned) may be given limited certification for specific purposes including rail traffic movements.
Before uncommissioned infrastructure is used:
- a Maintenance Representative must certify that it is fit for the specific purpose
- it must be advertised in a SAFE Notice
- A Maintenance Representative and a Qualified Worker must together unsecure and secure uncommissioned infrastructure as necessary.