This document describes the procedure for operating groundframes.
1–20 of 140 search results
This document describes the procedure for operating groundframes.
This document describes the procedure for protecting rail traffic.
This document describes the procedure for planning, implementing and managing a Local Possession Authority (LPA).
This document describes the procedure for planning, implementing and managing a Track Work Authority (TWA).
This document describes the procedure for planning, implementing and managing a Track Occupancy Authority (TOA).
This document describes the requirements for using lights for identification and warning.
This document describes the requirements for protecting rail traffic
This document describes the procedure for responding to faulty points.
This document describes the procedure for track vehicle travel.
This document describes the procedure for using Drivers time-release buttons.
This document describes the procedure for manual block working.
This document describes the procedure for using a half pilot staff.
This document describes the procedure for protecting in-service rail traffic inspections and repairs.
This document describes the procedure for using a large pilot staff.
This document describes the procedure for protecting Type F level crossings.
This document describes the procedure for switching a signal box or local control panel in and out.
This document describes the procedure for authorising rail traffic to pass an absolute signal at STOP.