Document | Effective Date | Version |
---|---|---|
NPR 700 Using a Local Possession Authority | 16 Jun 2024 | 7.3 |
NPR 701 Using a Track Occupancy Authority | 04 Dec 2022 | 10.3 |
NPR 702 Using a Track Work Authority | 04 Dec 2023 | 6.3 |
NPR 703 Using Absolute Signal Blocking | 20 Dec 2020 | 7.2 |
NPR 704 Using Infrastructure Booking Authorities | 29 Sep 2019 | 5.1 |
NPR 705 Removing 1500V supply | 30 Sep 2018 | 7.1 |
NPR 706 Removing 1500V supply in Electric Vehicle Maintenance Centres | 30 Sep 2018 | 6.1 |
NPR 707 Clipping points | 04 Dec 2022 | 7.2 |
NPR 708 Using X, Y and Z keys | 30 Sep 2018 | 4.1 |
NPR 709 Using railway track signals | 04 Dec 2022 | 5.2 |
NPR 710 Piloting rail traffic | 29 Mar 2021 | 5.1 |
NPR 711 Using Lookouts | 30 Sep 2018 | 5.1 |
NPR 712 Protecting work from rail traffic on adjacent lines | 29 Sep 2019 | 6.1 |
NPR 713 Placing temporary speed signs | 29 Jan 2019 | 6.1 |
NPR 714 Removing 1500V supply in unplanned situations | 30 Sep 2018 | 5.1 |
NPR 715 Protecting Type F level crossings | 04 Dec 2022 | 4.1 |
NPR 716 On site testing of Type F level crossings | 29 Apr 2017 | 3.0 |
NPR 717 Using emergency roadside warning equipment | 29 Apr 2017 | 4.0 |
NPR 718 Remote monitoring of Type F level crossing warning equipment | 29 Apr 2017 | 3.0 |
NPR 719 Operating groundframes | 29 Apr 2017 | 4.0 |
NPR 720 Protecting rail traffic | 29 Sep 2019 | 4.0 |
NPR 721 Spoken and written communication | 29 Apr 2017 | 5.0 |
NPR 722 Manual block working | 30 Sep 2018 | 4.1 |
NPR 723 Using block posts | 30 Sep 2018 | 3.1 |
NPR 724 Using clearance locations | 29 Apr 2017 | 3.0 |
NPR 725 Using a large pilot staff | 29 Sep 2019 | 3.2 |
NPR 726 Using half pilot staffs | 29 Sep 2019 | 3.2 |
NPR 727 Using crossovers for special working | 30 Sep 2018 | 3.1 |
NPR 728 Operating emergency crossovers | 30 Sep 2018 | 3.1 |
NPR 736 Using bell signals | 29 Apr 2017 | 3.0 |
NPR 737 Switching a signal box or local control panel in and out | 30 Sep 2018 | 3.1 |
NPR 738 Operating powered interlocking machines | 30 Sep 2018 | 3.1 |
NPR 739 Operating mechanical interlocking machines | 30 Sep 2018 | 3.1 |
NPR 740 Responding to faulty points | 04 Dec 2022 | 7.2 |
NPR 742 Manually operating cranked electric points | 29 Apr 2017 | 4.0 |
NPR 743 Manually operating hand throw electric points | 29 Apr 2017 | 6.0 |
NPR 744 Manually operating electro pneumatic points | 29 Apr 2017 | 5.0 |
NPR 745 Using non-interlocked points | 29 Apr 2017 | 3.0 |
NPR 746 Authorising rail traffic to pass an absolute signal at STOP | 29 Apr 2017 | 3.0 |
NPR 747 Using Drivers time release buttons | 29 Apr 2017 | 3.0 |
NPR 748 Track vehicle travel | 29 Apr 2017 | 5.0 |
NPR 750 Protecting activities associated with in service rail traffic | 04 Dec 2022 | 3.1 |
NPR 751 Calculating Minimum Warning Time | 29 Apr 2017 | 1.0 |
NPR 752 Using Automatic Track Warning Systems | 31 Oct 2021 | 1.2 |
NPR 753 Using Signal Key Switch Blocking | 04 Dec 2022 | 1.1 |
NPR 754 Using a signal key switch | 29 Sep 2019 | 1.0 |