This page shows the current version of the Network Procedures (NPR). The table below can be used to verify if printed or downloaded copies are current.

Document Effective Date Version
NPR 000 General information about Network Forms 14 May 2023 7.0
NPR 002 Using a Track Occupancy Authority (TOA) Form 14 May 2023 6.0
NPR 003 Using an Infrastructure Booking Authority (IBA) Form 14 May 2023 6.0
NPR 004 Using a Condition Affecting the Network (CAN) Form 14 May 2023 6.0
NPR 005 Using a Special Proceed Authority (SPA) Form 14 May 2023 6.0
NPR 007 Using a Pilot Staff Ticket 14 May 2023 6.0
NPR 008 Using a Pilot Staff Notice (PSN) 14 May 2023 6.0
NPR 010 Using a Pilot Staff Working Introduction Form 14 May 2023 5.0
NPR 011 Using a Worksite Warning Form 14 May 2023 5.0
NPR 012 Using an Unsignalled movement checklist 14 May 2023 5.0
NPR 013 Using a Temporary Rail Bond Approval Form 14 May 2023 5.0
NPR 014 Using a Worksite Protection Pre-work Briefing Form 05 Nov 2023 6.1
NPR 015 Using a Worksite Protection Plan 05 Nov 2023 6.1
NPR 017 Using a Protection Officer's Diary 05 Nov 2023 4.1
NPR 018 Using an Absolute Signal Blocking (ASB) Form 14 May 2023 3.0
NPR 700 Using a Local Possession Authority 16 Jun 2024 7.3
NPR 701 Using a Track Occupancy Authority 04 Dec 2022 10.3
NPR 702 Using a Track Work Authority 04 Dec 2023 6.3
NPR 703 Using Absolute Signal Blocking 20 Dec 2020 7.2
NPR 704 Using Infrastructure Booking Authorities 29 Sep 2019 5.1
NPR 705 Removing 1500V supply 30 Sep 2018 7.1
NPR 706 Removing 1500V supply in Electric Vehicle Maintenance Centres 30 Sep 2018 6.1
NPR 707 Clipping points 04 Dec 2022 7.2
NPR 708 Using X, Y and Z keys 30 Sep 2018 4.1
NPR 709 Using railway track signals 04 Dec 2022 5.2
NPR 710 Piloting rail traffic 29 Mar 2021 5.1
NPR 711 Using Lookouts 30 Sep 2018 5.1
NPR 712 Protecting work from rail traffic on adjacent lines 29 Sep 2019 6.1
NPR 713 Placing temporary speed signs 29 Jan 2019 6.1
NPR 714 Removing 1500V supply in unplanned situations 30 Sep 2018 5.1
NPR 715 Protecting Type F level crossings 04 Dec 2022 4.1
NPR 716 On site testing of Type F level crossings 29 Apr 2017 3.0
NPR 717 Using emergency roadside warning equipment 29 Apr 2017 4.0
NPR 718 Remote monitoring of Type F level crossing warning equipment 29 Apr 2017 3.0
NPR 719 Operating groundframes 29 Apr 2017 4.0
NPR 720 Protecting rail traffic 29 Sep 2019 4.0
NPR 721 Spoken and written communication 29 Apr 2017 5.0
NPR 722 Manual block working 30 Sep 2018 4.1
NPR 723 Using block posts 30 Sep 2018 3.1
NPR 724 Using clearance locations 29 Apr 2017 3.0
NPR 725 Using a large pilot staff 29 Sep 2019 3.2
NPR 726 Using half pilot staffs 29 Sep 2019 3.2
NPR 727 Using crossovers for special working 30 Sep 2018 3.1
NPR 728 Operating emergency crossovers 30 Sep 2018 3.1
NPR 736 Using bell signals 29 Apr 2017 3.0
NPR 737 Switching a signal box or local control panel in and out 30 Sep 2018 3.1
NPR 738 Operating powered interlocking machines 30 Sep 2018 3.1
NPR 739 Operating mechanical interlocking machines 30 Sep 2018 3.1
NPR 740 Responding to faulty points 04 Dec 2022 7.2
NPR 742 Manually operating cranked electric points 29 Apr 2017 4.0
NPR 743 Manually operating hand throw electric points 29 Apr 2017 6.0
NPR 744 Manually operating electro pneumatic points 29 Apr 2017 5.0
NPR 745 Using non-interlocked points 29 Apr 2017 3.0
NPR 746 Authorising rail traffic to pass an absolute signal at STOP 29 Apr 2017 3.0
NPR 747 Using Drivers time release buttons 29 Apr 2017 3.0
NPR 748 Track vehicle travel 29 Apr 2017 5.0
NPR 750 Protecting activities associated with in service rail traffic 04 Dec 2022 3.1
NPR 751 Calculating Minimum Warning Time 29 Apr 2017 1.0
NPR 752 Using Automatic Track Warning Systems 31 Oct 2021 1.2
NPR 753 Using Signal Key Switch Blocking 04 Dec 2022 1.1
NPR 754 Using a signal key switch 29 Sep 2019 1.0