NPR status page

This page shows the current version of the Network Procedures (NPR) documents. The table below can be used to verify if printed or downloaded copies are current.

DocumentEffective DateVersion
NPR Combined units24 Mar 20191.3
NPR 700 Using a Local Possession Authority30 Sep 20187.1
NPR 701 Using a Track Occupancy Authority30 Sep 201810.1
NPR 702 Using a Track Work Authority30 Sep 20186.1
NPR 703 Using Absolute Signal Blocking24 Mar 20197.1
NPR 704 Using Infrastructure Booking Authorities29 Apr 20175.0
NPR 705 Removing 1500V supply30 Sep 20187.1
NPR 706 Removing 1500V supply in Electric Vehicle Maintenance Centres30 Sep 20186.1
NPR 707 Clipping points30 Sep 20187.1
NPR 708 Using X, Y and Z keys30 Sep 20184.1
NPR 709 Using Railway Track Signals29 Apr 20175.0
NPR 710 Piloting rail traffic29 Apr 20175.0
NPR 711 Using Lookouts30 Sep 20185.1
NPR 712 Protecting work from rail traffic on adjacent lines29 Apr 20176.0
NPR 713 Placing temporary speed signs24 Mar 20196.0
NPR 714 Removing 1500V supply in unplanned situations30 Sep 20185.1
NPR 715 Protecting Type F level crossings29 Apr 20174.0
NPR 716 On-site testing of Type F level crossings29 Apr 20173.0
NPR 717 Using emergency roadside warning equipment29 Apr 20174.0
NPR 718 Remote monitoring of Type F level crossing warning equipment29 Apr 20173.0
NPR 719 Operating groundframes29 Apr 20174.0
NPR 720 Protecting rail traffic29 Apr 20173.0
NPR 721 Spoken and written communication29 Apr 20175.0
NPR 722 Manual block working30 Sep 20184.1
NPR 723 Using block posts30 Sep 20183.1
NPR 724 Using clearance locations29 Apr 20173.0
NPR 725 Using a large pilot staff30 Sep 20183.1
NPR 726 Using half pilot staffs30 Sep 20183.1
NPR 727 Using crossovers for special working30 Sep 20183.1
NPR 728 Operating emergency crossovers30 Sep 20183.1
NPR 736 Using bell signals29 Apr 20173.0
NPR 737 Switching a signal box or local control panel in and out30 Sep 20183.1
NPR 738 Operating powered interlocking machines30 Sep 20183.1
NPR 739 Operating mechanical interlocking machines30 Sep 20183.1
NPR 740 Responding to faulty points30 Sep 20187.1
NPR 742 Manually operating cranked electric points29 Apr 20174.0
NPR 743 Manually operating hand throw electric points29 Apr 20176.0
NPR 744 Manually operating electro pneumatic points29 Apr 20175.0
NPR 745 Using non-interlocked points29 Apr 20173.0
NPR 746 Authorising rail traffic to pass an absolute signal at STOP29 Apr 20173.0
NPR 747 Using Drivers time-release buttons29 Apr 20173.0
NPR 748 Track vehicle travel29 Apr 20175.0
NPR 750 Protecting activities associated with in-service rail traffic30 Sep 20183.0
NPR 751 Calculating Minimum Warning Time29 Apr 20171.0
NPR 752 Using Wireless Automatic Warning Systems30 Sep 20181.1